nouvelles

Dr Wee: Kelana Jaya LRT Line back in operation from 6am Nov 14

Dr Wee: Kelana Jaya LRT Line back in operation from 6am Nov 14

PETALING JAYA: The Kelana Jaya LRT Line will be stopping at all its 37 stations starting 6am Monday (Nov 14) following the five-day-shutdown involving 16 stations from Kelana Jaya to Ampang Park that began last week.

In a statement on Facebook Sunday evening (Nov 13), Transport Minister Datuk Seri Dr Wee Ka Siong said he had taken a test ride on the line as part of the comprehensive testing that evaluated all parameters, in particular, signalling stability as the train enters and departs the stretch from Kelana Jaya to Ampang Park.

ALSO READ: PM: Kelana Jaya LRT Line expected to resume operations earlier than scheduled

“I have been briefed by the Rapid Rail management on intensive tests conducted that involved 38 trains, all the way from Gombak to Putra Heights to ensure the Kelana Jaya line is totally safe and ready for full reopening.

“The overnight tests were supervised by the Rail Enforcement Division, the Rail Planning Division, the Land Public Transport Agency (Apad), which observed that the critical safety systems were working, without any form of instability seen. I am very satisfied with the analyses of the tests conducted,” he added.

More to come



#Wee #Kelana #Jaya #LRT #Line #operation #6am #Nov

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button